As two indispensable equipments in the solid control system of oil & gas drilling, desander & desilter are responsible for separating the small solids in the drilling fluids which has been treated by the shale shaker & vacuum degasser. The desander takes care of the solid with diameter 45~74μm, and 15~44μm for desilter.

OGEM Desander & Desilter

Normally desanders are mounted on the top of the first mud tank together with shale shakers & vacuum degassers, while desilters are mounted together with centrifuges. Sometimes to save the top area of the mud tank, desander & desilter are combined together to work as high efficient mud cleaner.
Desanders & desilters are consist of hydrocyclones, high pressure flow pipes & a small shale shaer at the bottom. For desanders & desilters, only one vibration motor is used to drive the screen basket. while for high efficient it would need two motors. There would equiped two 10" or 12" diameter iron hydrocyclones for desander just as the solids need to be separated is relatively big, and include some sands in the mud. While for desilters, it would equiped 6 to 12 pcs 4" diameter hydrocyclones which are made of wear resist plastic.
OGEM Hydrocyclone for Desander & Desilter
Working Principle of the hydrocyclones.
Hydrocyclone Working Principle - KOSUNHydrocyclone Working Principle - OGEM
For the work principle of hydrocyclones, it works like this. First the drilling fluids are sucked up to 0.25Mpa ~ 0.4Mpa by sand pump, and enter into the cones through the side inlet which is normally only 2-1/2" diameter. The fluids then flow spirally inside of the cone. Effected by the centrifugal force, the heavy solids in the fluids would be throwed towards the inner wall of the cones, go down to the bottem, and discharge through the sand discharge port, while the light fluids would go up and discharge through the upper oulet. The diameter of the bottom discharge port is adjustable, and with a cover of hydrocyclone.
As an quick-wear part of shale shaker  desander  desilter, the lifetime of hydrocyclones is not so long as other parts. So it is neccessary to check their working condition, and replace them with new ones. As a whole set of the hydrocyclone, clamps & flang are also replaced together with the hydrocyclones.
OGEM solids control is main professional manufacturer of solids control system in China, OGEM  is a vital part of the world hydrocarbon exploration and production industry, as well as one of top three solids control equipment suppliers in China, which offers its products for CNPC, CNOOC ,HH, Gazprom, RG, etc . If you want to know more information about solids control system and oil drilling solids control equipment  shale shaker,you can contact us online.

Tangshan Aojie Petroleum Machinery Equipment Make Co., Ltd (Short for: 
OGEM Solids Control)
Address: NO.2 Jingxi Road,Lunan District,Tangshan city,Hebei 
province,China
Tel: 86-315-8676484
Fax: 86-315-2648099
Zip Code: 063000
Email: ogem2@ogemsolidscontrol.com
       Info@OGEMSolidsControl.com
Website: http://www.ogemsolidscontrol.com/
Skype:burning_lee   
Facetime:bigshowlhc@163.com                             


http://www.hbequipments.com/sell-shale_shaker-829035.html
http://www.hbequipments.com/sell-hydrocyclone_desander-829178.html
http://www.hbequipments.com/sell-hydrocyclone_desilter-829219.html
http://www.hbequipments.com/sell-decanter_centrifuge-830036.html

没有评论:

发表评论