2014年4月2日星期三

about shale shaker screen of gnsolidsamerica’description

1.1 Lifting
When we lift the shale shaker screen, we need to handle it by lifting specific lift ring. There are 4 lift rings totally. Users should not attempt lifting by attachment to any other location to avoid breaking equipments


Warning! Do not make lift rope on any pipes nor vibration motors, and ensure the equipment are at even level when lift
1.2 Transportation
Refer to fig II there are four sets tension device. It including M20 tension bolts, cover, mat, gasket, and M20 nuts. When deliver the shaker, the tension devices are tensioned. This will keep equipment stable and safe during transportation to avoid any broken on shaker. When shale shaker arrive at job site, and finish installation the tension device can be released (Refer to Fig III). When we release it must keep M20 bolts, cover, mat, spring gasket and M20 nuts well to ensure every handling the shaker will be stable and safe.
Note: When running equipments, the shipping brackets must be uninstalled
Fig II. The tension bolt in tensioning Fig III. The tension bolts released
2 Installation
When shale shaker arrives at job site, make it at proper position and according to installation hole with sign of 4-Φ23 ( Refer to Fig I ). Make fixture, do related position fixing on all aspects to make installation, uninstall. If along with system, we’ll provide installation and fixture, user only need to connect and fix it
Connect electric power to shale shaker magnetic starter. Usually, the electric system will be 380V/50Hz. The vibration motor and magnetic starter can be customized according to clients’ requirement
There is button signed “ON”, “OFF” and have certain colour for identification. Shale shaker can be installed on even operation plate. The shale shaker can be designed as tandem shaker, and even more. But should make suitable connections and related pipes
Resource Box :
The author of the article  for shale shaker
OGEM solids control is main professional manufacturer of solids control system in China, OGEM  is a vital part of the world hydrocarbon exploration and production industry, as well as one of top three solids control equipment suppliers in China, which offers its products for CNPC, CNOOC ,HH, Gazprom, RG, etc . If you want to know more information about solids control system and oil drilling solids control equipment  shale shaker,you can contact us online.


Tangshan Aojie Petroleum Machinery Equipment Make Co., Ltd (Short for: 
OGEM Solids Control)
Address: NO.2 Jingxi Road,Lunan District,Tangshan city,Hebei 
province,China
Tel: 86-315-8676484
Fax: 86-315-2648099
Zip Code: 063000
Email: ogem2@ogemsolidscontrol.com
Website: http://www.ogemsolidscontrol.com/
Skype:burning_lee                                




http://shiyoujixie.en.ec21.com/
http://www.made-in-china.com/showroom/china-solids-control


没有评论:

发表评论