The working principle of drilling fluid mud cleaner

mud cleaner is a combination of desander  desilter mounted over a shaker with a fine mesh screen. A mud is fed to the inlet of the hydrocyclone (desander and/or desilter) to separate particles and the underflow passes to the fine screen mesh where in particles larger than barite are discarded and thrown away. In most drilling operations, a mud cleaner is installed in drilling fluid solids control system. It is usually located in a mud tank in the same location as with the desilters.

The working principle of drilling fluid mud cleaner:
OGEM high effective mud cleaner is the second or third stage separation equipment of drilling liquid, which will deal with the mud after being treated by the first grade separation equipment. The barite will be recovered and cuttings which are bigger than barite will be removed. Then the barite in the underflow will flow into circulation tanks through the screens when the weighted mud passes while the particles that are bigger than mesh will be removed.
The weighted mud flows to the inlet head section of the desander and/or desilter entering the hydrocyclones for separation of particles. Mud leaving the underflow is further screened with fine mesh to separate larger particles allowing only barite size particles to pass through the screen returning and recovering then the clean mud.
The purpose of the mud cleaner is to remove drilled solids larger than barite. Solids larger than 74-105 micrometers can be removed by the mud cleaner before the viscosity builds up. Mud cleaner can effectively control weighted drilling fluid solid content. Prevent differential pressure sticking, adhesion stuck drill accident, reduce the drill string and the filter cake thickness on bond issues.
Mud cleaner has the advantages of compact structure, save the tank space, convenient to maintain and use and with the large treating capacity.
Features & Benefits of OGEM mud cleaner:
1. Polyurethane (PU) Material, high-chromium cast iron or ceramic for desander and desilter cones.
2. Desander cones can be installed between one and three 10″desander cones, each cone can process 500GPM and makes a separation between 45 and 75 microns.
3. Desilter cones can be installed between eight and twenty 4″or 5″desilter cones ,each cone can process 80 GPM, and makes a separation between 15 and 45 microns.
4. Mechanical Deck Adjustable while operation for reliable performance.
5. Compact design with small footprint, with top feed and weir feed two option.
6. Hook-strip shaker screen for fast screens changing with PWP and PMD screens
According to intallation location and drilling requirements, drilling fluid mud cleaner also can be combined with desaner and shale shaker, also can be combined with desilter and shale shaker.

Tangshan Aojie Petroleum Machinery Equipment Make Co., Ltd (Short for: 
OGEM Solids Control)
Address: NO.2 Jingxi Road,Lunan District,Tangshan city,Hebei 
province,China
Tel: 86-315-8676484
Fax: 86-315-2648099
Zip Code: 063000
Email: ogem2@ogemsolidscontrol.com
Website: http://www.ogemsolidscontrol.com/
Skype:burning_lee                                


OGEM solids control is main professional manufacturer of solids control system in China, OGEM  is a vital part of the world hydrocarbon exploration and production industry, as well as one of top three solids control equipment suppliers in China, which offers its products for CNPC, CNOOC ,HH, Gazprom, RG, etc . If you want to know more information about solids control system and oil drilling solids control equipment  shale shaker,you can contact us online.


http://shiyoujixie.en.ec21.com/
http://www.made-in-china.com/showroom/china-solids-control


没有评论:

发表评论