Drilling fluid system including mud tanks system, the mud process equipment,such as shale shaker,desander,desilter,mud cleaner,decanter centrifuge,mud agitator,shear pump and etc. All pipelines and electrical lines, cables, and all accessory parts. Such as the ladders, hand rail, guard rail, etc.
Fluids system equipment mainly is shale shaker, hydrocyclone separators, centrifuge decanter, centrifugal pumps, and fluid mixers/agitators.
How to make high quality mud tanks system
High quality oilfield mud tank system must be fabricated under professional configuration. The optimal proposal with high efficiency and low cost. Cater to clients’ specific demand and actual drilling conditions.
All the equipments and tanks should be made of high quality raw material and produced according to executive standard. Inspect all equipment and oilfield drilling mud tanks completely and strictly. Ensure all pipes are connected with each other. All welding line should be sealed and plain.
How to make best of high quality drilling mud tanks system
Actually, we need almost fluid system include shaker tank, active, storage tank or mixing tank. Sometimes, there will be also the trip tank, pill tank, and swab or test tankThe mud tanks are different size or dimension. It depends on whole mud tanks system capacity or flow mud pump flow rate. Whole mud system including different phases and process steps. We need to calculate all information in detail
So usually the single mud tank effective volume or capacity including 20m3 and less, 20-40m3, then 40-70m3. Their length can be 8m, 9m, 10m, 11m, 12m, 15m, etc. specific requirement.
Tangshan Aojie Petroleum Machinery Equipment Make Co., Ltd (Short for:
OGEM Solids Control)
Address: NO.2 Jingxi Road,Lunan District,Tangshan city,Hebei
province,China
Tel: 86-315-8676484
Fax: 86-315-2648099
Zip Code: 063000
Email: ogem2@ogemsolidscontrol.com
Website: http://www.ogemsolidscontrol.com/
Skype:burning_lee
solids control system http://www.hbequipments.com/
没有评论:
发表评论