Decanter Centrifuge Maintenance Schedule

OGEM Solids Control as a professional decanter Centrifuge manufacturer in China. We particularly specialized in providing Decanter centrifuge for Drill solids control, High-Speed Separation,Barite recovery, and ultrafines removel. OGEM Decanter centrifuge are specially designed and built for heavy-duty jobs in oilfield operation. the maintenance of OGEM decanter Centrifuge  is relative easier compared with some other manufacturer’s.
Daily Maintenance Check:

             OGEM Decanter Centrifuge
1,Check the abnormal vibrations of the centrifuge is not allowed
2,Check temperature rise of the main bearings, normal temperature rise ≤40℃.
3,Check whether the bolts of the pillow blocks has become loose.
4,Check dsicharge solids and clarified effluent, and whether mud has leakage from casing.
5,Review the gearbox to make sure whether it has oil leakage (after opening the hole cover on the back motor guard, look carefully to check that sites such as the limit switch etc. has oil stain or not).
6,Observe the hydro-coupling to make sure whether it has oil leakage.
7,In case of any abnormality in the above-mentioned inspection, immediately stop the centrifuge for disposal or fill the oil.
Maintenance every 100 working hours
1,Inspect the V-belts after each running for 100 hours and adjust it if it is too loose.
2,Replace the belts if it’s  immoderate wearing.
3,After each running for 100 hours or excessive vibrations, turn off the centrifuge to inspect whether screws of the bowl and of the gearbox have become loose.
4,Inspect whether pulley screws or round nut have become loose.
5,Respectively inspect oil level of the gearbox and the hydro-coupling after each running for one month and perform oil filling for insufficiency according to the regulations.
Maintenance every 8000 working hours
1,Inspect abrasion of discharge bushings and conveyor flight.
2,Inspect deformation of vessel assembly.
3,Inspection of load-bearing parts:  such as bowl and semi-shaft of big and small end, semi-shaft of the conveyor and semi-shaft of spline housing, gearbox adaptor and pillow blocks.
4,For any crackle, severe deformation and immoderate corrosion, replacement is required.
5,Inspection of the gearbox and replace all the seals,bearings and bolts.
6,Replace the whole gearbox if the gears has be damaged or abrased seriously.
7,Inspection of vibration dampers and replace the failed ones.

Tangshan Aojie Petroleum Machinery Equipment Make Co., Ltd (Short for: 
OGEM Solids Control)
Address: NO.2 Jingxi Road,Lunan District,Tangshan city,Hebei 
province,China
Tel: 86-315-8676484
Fax: 86-315-2648099
Zip Code: 063000
Email: ogem2@ogemsolidscontrol.com
Website: http://www.ogemsolidscontrol.com/
Skype:burning_lee        
OGEM solids control is main professional manufacturer of solids control system in China, OGEM  is a vital part of the world hydrocarbon exploration and production industry, as well as one of top three solids control equipment suppliers in China, which offers its products for CNPC, CNOOC ,HH, Gazprom, RG, etc . If you want to know more information about solids control system and oil drilling solids control equipment  shale shaker,you can contact us online.

没有评论:

发表评论