Derrick Shale Shaker For Drilling Fluid In Petroleum Field
THE INTRODUCTION OF SHALE SHAKER
Shale shakers are components of drilling equipment utilized in many industries, such as coal cleaning, mining, oil and gas drilling. They are considered to be the first phase of a solids control system on a drilling rig, they are used to remove large solids also called cuttings from the drilling fluid, more commonly called "Mud" due to its similar appearance.
Drilling fluids are integral to the drilling process and, among other functions, serve to lubricate and cool the drill bit as well as convey the drilled cuttings away from the bore hole. These fluids are a mixture of various chemicals in a water or oil based solution and can be very expensive to make. For both environmental reasons and to reduce the cost of drilling operations drilling fluid losses are minimized by stripping them away from the drilled cuttings before the cuttings are disposed of, this is done using a multitude of specialized machines and tanks.
Shale shakers are the primary solids separation tool on a rig. After returning to the surface of the well the used drilling fluid flows directly to the shale shakers where it begins to be processed. Once processed by the shale shakers the drilling fluid is deposited into the mud tanks where other solid control equipment begin to remove the finer solids from it. The solids removed by the shale shaker are discharged out of the discharge port into a separate holding tank where they await further treatment or disposal.
Shale shakers are considered by most of the drilling industry to be the most important device in the solid control system as the performance of the successive equipment directly relates to the cleanliness of the treated drilling fluid.
THE STRUCTURE OF SHALE SHAKER
Shale shakers
consist of the following parts:
1.'''Hopper''' -
The Hopper, commonly called the "base" serves as both a platform for
the shaker and collection pan for the fluid processed by the shaker screens,
also known as "underflow". The hopper can be ordered according to the
needs of the drilling fluid, aka "mud" system. It can come in
different depths to accommodate larger quantities of drilling fluid as well as
have different ports for returning the underflow to the mud system.
2.'''Feeder'''-
The Feeder is essentially a collection pan for the drilling fluid before it is
processed by the shaker, it can come in many different shapes and sizes to
accommodate the needs of the mud system. The most commonly used feeder is known
as the weir feeder, the drilling fluid enters the feeder usually through a pipe
welded to the outside wall near the bottom of the feeder tank, it fills the
feeder to a predetermined point and like water flowing over a dam the mud
(drilling fluid) spills over the weir and onto the screening area of the
shaker. This method of feeding the shaker is most widely used due to its
ability to evenly distribute the mud along the entire width of the shaker
allowing for maximum use of the shaker's screening deck area.
:Some feeders can
be equipped with a bypass valve at the bottom of the feeder which allows the
drilling fluid to bypass the shaker basket and go directly into the hopper and
back into the mud system without being processed by the shaker screens.
3.'''Screen
Basket'''- Also known as the screen "bed" it is the most important
part of the machine, it is responsible for transferring the shaking intensity
of the machine, measured in "G's", while keeping the
"shaking" motion even throughout the entire basket. It must do all
that while holding the screens securely in place, eliminating drilled solids
bypass to the hopper and allowing for easy operation and maintenance of the
machine. Different brands of shakers have different methods of fulfilling these
demands by using specialized screen tensioning apparatus, rubber seals around
the screens, basket reinforcement to limit flex, rubber Float Mounts rather
than springs, rubber Deck seals and selective vibrator placement.
4.'''Basket
Angling Mechanism'''- The shaker basket must be capable of changing its angle
to accommodate various flow rates of drilling fluids and to maximize the use of
the shaker bed, this is where the angling mechanism plays an important part.
The drilling fluid flowing over the shaker bed is designated into two categories:
**''Pool:'' Which
is the area of the screening deck that comprises mostly of drilling fluid with
drilled cuttings suspended within it.
**''Beach:'' Is
the area where the fluid has been mostly removed from the cuttings and they
begin to look like a pile of solids.
5.'''Vibrator'''-
This is the device which applies the vibratory force and motion type to the
shaker bed. A vibrator is a specialized motor built for the purpose of
vibrating, While containing an electric motor to provide the rotary motion it
utilizes a set of eccentric weights to provide an omnidirectional force. To
produce the proper Linear motion a second, counter rotating, vibrator is added
in parallel to the first. This is what gives us the linear motion, "high
G" shaking of the basket.
THE SCREEN PANELS
OF SHALE SHAKER
Screen selection
is critical in the operation of a drilling rig as the shakers are the primary
stage in the removal of drilled solids. Improper screen selection can lead to,
loss of expensive drilling fluids, premature [[pump]] failures, overloading of
other solids removal equipment such as a centrifuge, decreased equipment life,
reduced rate of penetration and serious problems in the well bore.
A shaker screen
consists of the following parts:
1.'''Screen
Frame'''- Much like a canvas for painting a screen has to be supported on a
frame in order to do its job, this frame differs between manufacturers in both
material and shape. Screen frames can be made from materials such as, square
steel tubing, flat steel sheets, plastic type composites or they can just be
supported on the ends with strips of steel (similar idea to a scroll). These
frames consist of a rectangular shaped outer perimeter which is divided into
small individual inner panels. These smaller panels differ in shape from
manufacturer to manufacturer and have been known to come in shapes such as
square, hexagonal, rectangular and even triangular.
2.'''Screen
Mesh'''- Just like thread is woven together to create cloth, metal wire can be
woven to create a metal cloth. Screen Mesh has evolved over many years of
competitive screen manufacturing resulting in very thin yet strong cloth
designed to maximize screen life and conductance as well as to provide a
consistent cut point. To increase the conductance of a mesh screen you have to
minimize the amount of material in the way, this is done by either reducing the
wire diameter or weaving the cloth to produce rectangular openings. Rectangular
openings increase the screens conductance while minimizing the effect on its
cut point where as square openings provide a more consistent cut point but
offer a lower conductance.
3. '''Binding
Agent'''- The binding agent is the material used to bind the mesh to the screen
frame, it is designed to maximize adhesion to both materials while being able
to handle high heat, strong vibration, abrasive cuttings and corrosive drilling
fluids.
4. '''3D Screen
Technology'''- One of the more recent advances in oilfield screen technology
has brought us the "3D screen", this technology is an innovative
method for increasing the screening area of a shale shaker without the need to
build larger machines. When seen from the side these screens look like
corrugated cardboard, having a flat bottom and wave like shapes on top. These
waves are designed to increase the surface area of the screen panel by building
up in stead of out, thereby maximizing the surface area of the screen without
the need to build larger shaker screens and in turn larger, heavier and more
expensive shakers.
:*The tapered
valleys, while moving under high G's, apply a compression force on the solids
similar to wringing out a cloth to draw out liquid.
:*Increasing the
surface area of the shaker allows the use of finer screens earlier in the
drilling process while maintaining acceptable flow rates and penetration rate.
Effectively removing harmful drilled solids before they can begin to wear out
the solids control equipment.
Although the
performance of these screens is quite impressive the only way to truly gauge
the performance of any screen is to try it out and collect comparative data of
your own.
CAUSES OF SCREEN
FAILURE OF SHALE SHAKER
1. Mishandling of
screen panels during storage
2. Improper
handling during installation
3. Improper
installation of shaker screen to shaker basket
4. Over/Under
tensioning
5. Dirty, worn or
improperly installed deck rubbers
6. Improper
cleaning of the screens while in storage
7. Extremely high
mud weight
8. Heavy solids
loading
9. Improperly
manufactured screens
10. Use of high
pressure wash guns to clean or un-blind screens
OGEM
AJS SHALE SHAKER--------A GOOD CHOICE
AJS Shaker
is linear motion. This model shale shaker is high efficiency, Reduces mud
losses via a dry solids discharges. The shaker screen area can upto 2.94m2
. Please come to OGEM get more information on AJS Shaker and shaker
screen. The professional solvement is here
FEATURES OF OGEM AJS SHALE SHAKER
1.Two side tensioning or block tighting screen-More
reliable
2.Various screen type-Flexible
3.High G vibration motor-High efficiency
4.Linear motion-Rapid discharges
5.Mechanical deck angle adjustment-Easy and convenient
BENEFITS OF OGEM AJS SERIOUS SHALE SHAKER
1.Compact footprint and light
2.User-friendly
3.Easy to installation
4.Low cost on operation and maintenance.
5.Low noise
6.Decrease drilling cost
T
TECHNIQUE PARAMETERS OF OGEM AJS SHALE SHAKER
Model
|
AJS603L
|
AJS604L
|
AJS703L
|
AJS704L
|
AJS833L
|
ABES703
|
Vibration mode
|
Linear motion
|
BEM
|
||||
Vibration motor
|
2×1.5KW
|
2×1.72KW
|
2×1.5KW
|
2×1.72KW
|
2×1.72KW
|
2×1.5KW
|
G force
|
≤7.0G
|
≤7.0G
|
≤7.2G
|
≤7.3G
|
≤7G
|
≤7.2G
|
Double amplitude
|
5.5~6.0mm
|
5.5~6.0mm
|
6.0~7.2mm
|
6.0~7.2mm
|
5.5~6.0mm
|
6.0~7.2mm
|
Treating capacity
|
100m3/h
440GPM |
140m3/h
616GPM |
120m3/h
528GPM |
160m3/h
700GPM |
140m3/h
616GPM |
140m3/h
616GPM |
Deck adjustment
|
-1°~ +5°
|
-1°~ +5°
|
-1°~ +5°
|
-1°~ +5°
|
-1°~ +5°
|
-1°~ +5°
|
Frequency
|
380V/50HZ,460V/60HZ, or customizable
|
|||||
Screen area
|
2.05m2
|
2.7 m2
|
2.2 m2
|
2.94 m2
|
2.7 m2
|
2.2 m2
|
Screen size
|
585×1165mm
(40~200 mesh) |
585×1165mm
(40~200 mesh) |
700×1050mm
(40~200 mesh) |
700×1050mm
(40~200 mesh) |
830×1080mm
(40~200 mesh) |
700×1050mm
(40~200 mesh) |
Screen panel
|
3
|
4
|
3
|
4
|
3
|
3
|
Weir height
|
746mm
|
|||||
Decibels
|
<85db
|
|||||
Starter
|
Magnetic force starter
|
|||||
Weight
|
1550kg
|
1700kg
|
1750kg
|
2100kg
|
1700kg
|
1750kg
|
1. Before service: According to client requirements, OGEM will provide optimal solutions at earliest time.
2. After service: All OGEM
equipments will have
one year guarantee after commissioning date except wearing parts and
illeagle
operation.
3. Commissioning: As per user demand, OGEM can arrange engineer do 1st commissioning for free. We
can also provide training courses to client
staff.
4. Emergency solution: The time to client job site depend
on visa issuance. Anyhow, we will do our best to solve emergency as soon as we
can.
5. Sapre parts supply: OGEM have considerable stock to
stare various spare parts. This guarantees the spare parts can be sent to the
clients in time.
How to Ensure High Quality ?
1. Vibration motor is from top MFG:
Ital-Vibras
2. Standard steel is from Chinese top manufacturer:
HBIS
3. Paint oil is from famous Kansai & COSCO Paint
Co. Ltd
4. Eletrical materials from SIMENSE or Schneider
5. All motors and electric parts are explosion proof
type
6. All outsourcing parts are from top
manufacturers both domestic and overseas.
b. Two
pack Epoxy zinc-rich primer painting
c. Two
Pack Epoxy hi-build containing anticorrosive pigments.
d. Surface pigmented with high quality light fast PU
pigments
About
Us
1.Our
factory is more than 21000 squre meters
2. Own more than 200 workers
and 50 professional R&D persons of
20-year experience in petroleum industry, especially mud process equipments
3. 20 year experence manufacturer on oil and gas drilling mud
process4. ISO 9001:2008 certificate
5. Offer free guarantee and training courses
6.Have stock all the year to offer convenience
to our customers.
7.Can be customized, OEM is welcome
8.We attend solid control fair:
CIPPE 2012 BeiJing, NOG 2012, Guangzhou trade fair
CONTACT WITH US
Any requirements, please contact with us freely!
Tangshan Aojie Petroleum Machinery Equipment Make Co., Ltd (Short for: OGEM Solids Control)
Address: NO.2 Jingxi Road,Lunan District,Tangshan city,Hebei province,China
Tel: 86-315-8676484
Fax: 86-315-2648099
Zip Code: 063000
Email: ogem2@ogemsolidscontrol.com
Website: http://www.ogemsolidscontrol.com/
Need any lateast news about the Hydrocyclone desender or other oilfield equipment,please enter in our website. WELCOME!!!
没有评论:
发表评论