2014年5月6日星期二

OGEM Oilfield Drilling Mud Circulation system

Drilling without removing solids, the drilling mud recycling system will contain a constant volume of slid phase. The pit level will also remain at a constant level even though the circulating volume increases as an additional hole is drilled, (pit levels will actually rise by the volume of the drill string added to the hole). The additional solids from drilling mud will increase the mud weight. Usually many problems will arise if too many drilling solids are allowed to remain in the drilling mud. These effects do not immediately appear after the drilling solids concentrations reach excessive levels. For this reason, many drillers accustomed to drilling shallow wells with unweighted drilling mud find it hard to believe that drilling solid are the cause of their problems. Experience has shown them otherwise. Therefore, it is beneficial to take the detrimental effects of drilling solids seriously and remove them from the drilling mud.

It is known that drilling processes are: fluid-purification process, fluid circulating process, mud dosing process, mud concocting process, mud weighting process, automatic irrigating process, etc. Amongst them, drilling mud circulation system has been frequently mentioned in previous passages surrounding solids control technology, and are to be more illustrated in this one. 
Mud Circulation system
The centrifugal pump, arranged inside mud cabin, suctions cleaned mud with the aid of injection pump. The drilling fluids travels out under the high pressure of AC variable frequency centrifugal pump, through dual high pressure pipelines to vertical pipe valve group standing on the drill floor after the divergence via valves in mud cabin, through the double tribble, hose, upper driving device(or swivel), inner chamber of drillstring to drill bit in the well hole. Then, the high-pressure drilling fluids jets into the well bottom and carries solid phase back to wellhead via the annular space between drillstring and casing pipes, out from the horn mouth under the turntable, through the mud pipelines below drill block to the horizontal mud cabin, and through the verticle mud cabin and the treatment of shale shaker into the drilling mud recycling system. Afterwards, the drilling mud circulaing process is completed when the drilling fluids circulates through shale shaker    desander  desilter  decanter centrifuge  centrifuge centrifugal pump   mud cleaner   vacuum degasser   Hydrocyclone cone    mud agitator    flare igniter     submersible slurry pump  mud tank    mud gas separator   Jet Mud Mixer    mud mixing pump   mud gun  screw pump    Shale Shaker Screen    shearing pump   Vertical Cutting Dryer.
OGEM solids control is main professional manufacturer of solids control system in China, OGEM  is a vital part of the world hydrocarbon exploration and production industry, as well as one of top three solids control equipment suppliers in China, which offers its products for CNPC, CNOOC ,HH, Gazprom, RG, etc . If you want to know more information about solids control system and oil drilling solids control equipment  shale shaker,you can contact us online.

Tangshan Aojie Petroleum Machinery Equipment Make Co., Ltd (Short for: 
OGEM Solids Control)
Address: NO.2 Jingxi Road,Lunan District,Tangshan city,Hebei 
province,China
Tel: 86-315-8676484
Fax: 86-315-2648099
Zip Code: 063000
Email: ogem2@ogemsolidscontrol.com
       Info@OGEMSolidsControl.com
Website: http://www.ogemsolidscontrol.com/
Skype:burning_lee   
Facetime:bigshowlhc@163.com                             


http://www.hbequipments.com/sell-shale_shaker-829035.html
http://www.hbequipments.com/sell-hydrocyclone_desander-829178.html
http://www.hbequipments.com/sell-hydrocyclone_desilter-829219.html
http://www.hbequipments.com/sell-decanter_centrifuge-830036.html

没有评论:

发表评论